Port power capacity: How ports are 'scaling up' to meet new power and resilience demands
16 Jun 2026
Singapore
Scaling up Port Infrastructure
This presentation will discuss how ports can respond to new power demands both for vessel cold-ironing, as required by vessel In-Port requirements under AFIR, as well as increasing need for shore-side charging of the increasing size of installed batteries. A key aspect of this scaling up is how they can ensure power resilience. How are ports set up to deal with a grid power failure (Heathrow last year and Channel Tunnel more recently) and what impact that would that have on port operations, local navigation, VTS systems and overall safety.
